Blue Lake Rancheria (BLR), California (TBCP I)

Project Title:
BLR Broadband Planning, Design, and Stage 1 Deployment

Funding Program:
Tribal Broadband Connectivity Program - Round 1

Project Purpose/Type:

With NTIA funding, the Blue Lake Rancheria’s Planning, Engineering, Feasibility, and Sustainability Studies and Infrastructure Deployment project will consist of the engineering and design of a resilient 2.2-mile, 48-strand Fiber loop encompassing BLR contiguous trust lands, along with a single 2.5 GHz spectrum radio broadcast location. The project will also construct a 1700-foot section of the middle mile fiber and deploy the 2.5 GHz spectrum for the entire service area, providing broadband speeds with a minimum of 25/3 Mbps with a latency of less than 100 ms to 45 unserved Tribal households, 15 unserved Tribal community anchor institutions, and 8 unserved Tribal businesses.

State(s):

California
  • $493,400.48
    Funding Amount